Lawrence Hill Health Centre – Commercial Solar Panel Installation in Bristol

A Cleaner Power for Better Care, Everyday

Lawrence Hill Health Centre’s rooftop system meets much of its daytime demand. It saves about £7,500 a year and prevents up to 10,000 kg of CO₂.

£200K

Lifetime client savings

45KW

System Size installed

240K Kg

Co2 Saved

100

Panels installed

lawrence hill health centre

Financial Impact

Lifetime energy savings

£200,000

Pounds

System Cost

£45,000

Pounds

Estimated ROI

5-6

Years

Average annual savings

£8,000

Pounds

Average monthly savings

£667

Pounds

Average weekly savings

£155

Pounds

Energy
production

Annual Energy Generation

48,000

kWh

Specific Yield

1,070

kWh / kWp

Self Sufficiency

40%

Years

Environmental
Impact

Lifetime Carbon Offset

240,000

kg CO2

Equivalent trees planted

10,000

Average Carbon offset Yearly

10,000

kg CO2

Brands installed

Solar Panels

DMEG

DMEGC Solar

Inverter

Solax Power

solax power

CLIENT

Lawrence Hill Health Centre in Bristol is a bustling healthcare center committed to providing vital services to residents. With rising operational costs and a growing focus on environmental responsibility within the healthcare sector, the centre sought to reduce its dependency on conventional grid power. Their goal was to secure long-term energy savings while showcasing a strong commitment to sustainability and cleaner air for the community

lawrence hill health centre
lawrence hill health centre

The Project

To meet the Health Centre’s high energy demand during daytime, Solar4Good designed and installed a 45 kWp rooftop solar PV system. The installation was carefully engineered to integrate with the existing roof structure while maximising performance across both south- and east-facing pitches.

Technical Scope:

  • 100 × DMEG 450W solar panels (total system size: 45 kWp)
  • 1 × Solax X3-MGA-40k-G2 inverter (40 kW, 3-phase)
  • Roof pitch: 22° (South & East facing)
  • Project value: £45,000

The Solution

Solar4Good provided a full-service package covering feasibility, design, installation, and commissioning.

Key Features:

  • Optimised Dual Orientation – By using both south- and east-facing roof slopes, the system spreads generation across the day to align with the centre’s usage.
  • High-Performance Equipment – DMEG Tier 1 panels combined with Solax inverter technology to ensure consistent efficiency and durability.
  • Healthcare Compliance – The installation was planned and delivered with minimum disruption for the daily operations of the organization, making sure uninterrupted healthcare services.
  • Future-Proof Design – System sized to allow potential battery integration in the future.

The Result

The solar panel system is now producing ~45,000–48,000 kWh annually, directly offsetting a significant proportion of electricity consumption and reducing strain on operational budgets.

Environmental Benefits:

  • Annual CO₂ savings: 9,000–10,000 kg
  • Lifetime carbon offset: 225,000–240,000 kg CO₂
  • Equivalent to planting 9,000–10,000 trees

Financial Outcomes:

  • Lifetime energy savings: £180,000–£200,000 (over 25 years)
  • Average annual savings: £7,200–£8,000
  • ROI / Payback period: 5–5.5 years

Client Benefits:

  • Lower and much predictable energy costs
  • Strong environmental leadership in the healthcare community
  • Reduced carbon footprint in line with NHS and UK Net Zero Goals
  • Long-term energy  resilience and possibilities for battery storage add-on

Get similar Results for your Business