Sized for manufacturing units, multi-tenant offices and large retail with annual demand of 60,000 to 90,000 kWh. On extended day shifts, self-consumption frequently exceeds 90%, making the case particularly strong even without storage.
Illustrative only. Your free assessment confirms the exact figures for your building.
70kW · 140-155 panelsA 70kW commercial solar system suits manufacturing units, multi-tenant office buildings and large retail units with annual electricity demand of 60,000 to 90,000 kWh. It uses 140 to 155 panels across 320 to 380 square metres of roof.
For manufacturing operations on extended day shifts, self-consumption frequently exceeds 90%, making the financial case particularly strong even without storage. Multi-tenant offices benefit from clear submetering that allocates solar generation between tenants, and all paperwork, grid approvals and AIA guidance are handled by Solar4Good.
Indicative figures for a 70kW commercial system on a typical UK site. Your exact output depends on your roof, orientation, shading and usage, confirmed in a site visit.
Indicative, not a quote · final figures after a free roof assessment.
Every 70kW system is designed around your site’s demand profile and usage, then installed by the same MCS-certified team that assessed it. Certified under our own MCS registration, no remote sales centre, 3,000+ UK homes and counting.
For businesses using 60,000 to 90,000 kWh a year, a 70kW system covers a large share of demand, and for extended-shift manufacturing self-consumption frequently exceeds 90% without a battery.
If your demand is lower a 50kW system may suit; if higher, look at 80kW or 100kW. We size precisely from 12 months of your meter data, and for multi-tenant sites we design in submetering to allocate generation fairly.
We design and install commercial systems across the UK, certified under our own MCS registration. A few recent examples near this scale:
Pick your rough annual electricity use for a starting point, then compare the commercial sizes below. We size precisely from 12 months of your meter data in a site visit.
Larger sites? We install commercial systems up to 150kW and beyond.
You work with a UK-wide commercial team based in Harrow, not a remote sales centre. The person who assesses your roof is directly involved in designing the system, and once it is in we handle MCS certification, SEG export-tariff setup and your monitoring app, so you are never left navigating the process alone.
“George the sales chap was straightforward and honest, and the whole installation team were awesome, courteous and professional throughout.”
“From start to finish the whole job has been seamless. The install guys were polite, knowledgeable and efficient.”
“I wholeheartedly recommend this company for solar and battery storage installation.”
The questions businesses actually ask about a 70kW commercial solar system.
A 70kW system suits manufacturing units, multi-tenant offices and large retail with annual demand of 60,000 to 90,000 kWh. On extended day shifts, self-consumption frequently exceeds 90%, so the case is strong even without storage.
140 to 155 panels across roughly 320 to 380 square metres of roof, sized to deliver 70 kW DC. They fit most large commercial and industrial roofs.
Commercial solar is eligible for the Annual Investment Allowance, business rates exemption to April 2035, and 20% reclaimable VAT. With high daytime self-consumption, payback is typically faster than an equivalent residential system.
Yes. Every commercial project starts with a site visit and structural assessment. A qualified engineer reviews roof type and load capacity and, where available, 12 months of half-hourly meter data to design around your actual demand.
Most installations are carried out under our own MCS registration. Further afield we use installers working under our MCS registration, and the certificate and workmanship warranty remain ours. We handle all paperwork, grid approvals, MCS certification and AIA modelling guidance for your accountant.
Guides from our engineers on the commercial business case, batteries, EV charging and export.

Start with a site visit, structural assessment and a fixed-price commercial proposal from our MCS-registered installers. No cost, no obligation, response within 24 hours.